PHASE 2 PROJECT PHOTOS – CONSTRUCTION PHOTOS

Pouring concrete at the remaining 3rd floor Facing East (1) (800x600).jpg Pouring concrete at the remaining 3rd floor Facing East (800x600).jpg Sprinkler pipe at the 1st floor Facing North-West (800x600).jpg Started installing the sprinkler main pipe at the 1st floor Facing West (800x600).jpg Welded clips at the 2nd Floor (East Elevation).jpg Welding clips at the 1st and 2nd floor Facing East (800x600).jpg Bathroom roughing at Rooms 133, and 136 Facing East (800x600).jpg Continued installing duct work hangers at the 3rd floor Facing North-West (800x600).jpg
Previous pageNext page Started installing the sprinkler main pipe at the 1st floor Facing West (800x600)
Started installing the sprinkler main pipe at the 1st floor Facing West (800x600)